Your Current Position:  Cases > Power
  • Power

    Time

    Client

    Project Introduction

    02.06.2017

    Tianjin Haide Runzi Building Materials Co. LTD

    Hydraulic rod repair.

    30.04.2019

    Tianjin Chentang Thermoelectric Co. LTD

    The valve core fine turning and defect laser repair welding.

    24.04.2019

    Tianjin Chentang Thermoelectric Co. LTD

    Take out the broken wire of the bolt on the rotor of the gas turbine.

    13.05.2019

    Tianjin Chentang Thermoelectric Co. LTD


    Manufacture of pneumatic valve coupling at the inlet of the booster

    28.08.2019

    Tianjin Chentang Thermoelectric Co. LTD

    Manufacture of the connection assembly of the oil filter screen of the high pressure feed water pump.

    17.09.2019

    Tianjin Chentang Thermoelectric Co. LTD

    On-site valve grinding at the bottom of Edward drain gate.

    26.10.2019

    Tianjin Chentang Thermoelectric Co. LTD

    Take out the turbine nozzle bolts on site.

    02.12.2019

    Tianjin Chentang Thermoelectric Co. LTD

    On-site drilling and tapping.

    16.03.2020

    Tianjin Chentang Thermoelectric Co. LTD

    Fuel heater inlet valve provided.

    14.05.2020

    Tianjin Chentang Thermoelectric Co. LTD

    Machine power tower fan parts processing.

    06.09.2019

    Tianjin Huadian Nanjiang Thermal Power Co. LTD

    Bent steel pipe.

    07.12.2019

    Tianjin Huadian Nanjiang Thermal Power Co. LTD

    Turning gear processing.